fbpx
Requirements For Building Approval In Lagos || Part 2 || Interview With Momah Samuel - Installment Homes
18862
post-template-default,single,single-post,postid-18862,single-format-standard,bridge-core-2.6.8,qode-page-transition-enabled,ajax_fade,page_not_loaded,,qode-title-hidden,transparent_content,qode-overridden-elementors-fonts,qode-child-theme-ver-1.0.0,qode-theme-ver-25.3,qode-theme-bridge,disabled_footer_bottom,elementor-default,elementor-kit-16257,elementor-page elementor-page-18862

Requirements For Building Approval In Lagos || Part 2 || Interview With Momah Samuel

Part 2 of our interview session with Momah Samuel, on building approval in Lagos and the different agencies you must engage.

Sequel to our thrilling part 1, where we unraveled important documents you will need for building approval in Lagos, e.g. survey plan, architectural drawing, mechanical & electrical drawing etc

We delve further on this episode, on submitting your drawings at LASPPA (Lagos state physical planing authority), and the roles of other agencies like LASBCA and LSMTL

In addition, we also share tips on procurement, building materials and permits. Crucially, after obtaining the building approval, there are other conditions that must also be met at site, else your construction site can be sealed..

Watch the video below for more details.

No Comments

Post A Comment

Talk on Whatsapp