fbpx
5 Red Flags To Avoid Building Demolition in Lagos - Installment Homes
18945
post-template-default,single,single-post,postid-18945,single-format-standard,bridge-core-2.6.8,qode-page-transition-enabled,ajax_fade,page_not_loaded,,qode-title-hidden,transparent_content,qode-overridden-elementors-fonts,qode-child-theme-ver-1.0.0,qode-theme-ver-25.3,qode-theme-bridge,disabled_footer_bottom,elementor-default,elementor-kit-16257,elementor-page elementor-page-18945

5 Red Flags To Avoid Building Demolition in Lagos

Building demolitions in lagos can have devastating consequences, and it’s essential to be vigilant and aware of potential red flags to prevent such disasters.

If your building or property is close to these 5 red flags, it’s a matter of time before you receive bulldozer for demolition by Lagos state government;

1) Pipeline Setback
2) Road Alignment
3) Powerline Setback
4) Rail Line Setback
5) Canal and drainage

No Comments

Post A Comment

Talk on Whatsapp